enro

Products

 

Products

TankRom Construct designs, manufactures and installs overground storage tanks for drinking water and fire reserve. Provides quality and competitive equipment at attractive prices. We use raw materials and materials that meet the standards of quality, resistance and endurance.

All the tanks manufactured by us contain elements that are not degradable in contact with water, INSP certified, so if the equipment that has a unique fire reserve destination is supplied with drinking water, it can be used anytime for this purpose (water supply drinking).

In conclusion, our customers have understood that the price is not the only element defining the choice of products but the quality – price ratio. We have chosen and will continue to use stainless steel L304 for making hydraulic connections, the EPDM approved sanitary membrane, even though we produce drinking water storage tanks or fire water storage tanks.

 

Tank models

Total
Capacity
(mc)
Usable
Capacity
(mc)
Tank
Diameter
(mm)
Tank
Height
(mm)
Total
Height
(mm)
Concrete
Platform
Diameter (mm)
23
20
3800
2000
2200
4800
58
50
4600
3600
3800
5600
94
85
5400
4100
4300
6400
110
100
5400
4800
5000
6300
174
150
6800
4800
5000
7800
223
200
7700
4800
5000
8600
317
300
9170
4800
5000
10070
431
400
10700
4800
5000
11700
517
500
12100
4800
5000
1300
667
600
12100
5800
6000
1300
717
700
13800
4800
5000
14700
822
800
13800
6000
6200
14700
956
900
13800
6600
6800
14700
1076
1000
13800
7200
7400
14700
2157
2000
21400
6000
6200
22300
3062
3000
25500
6000
6200
26400
4381
4000
30500
6000
6200
31400
5317
5000
33600
6000
6200
34500
 

Materials used in the structure

  • The Roof: 60 mm thick polyurethane sandwich wall mounted on type I profile traverse structure with a resistance of 2.4 kN/m2. 0.5 mm thick epoxy coated steel plates are fitted over.
  • The tank body is made of 2500×1250 mm galvanized steel plates, with these it forms cylindrical viroles. At most 600 g/m2 Zn hot galvanized anticorrosive coating is applied.
  • The thickness of the plates is between 2-8 mm depending on the static and dynamic resistance calculation of the respective tank.
  • The thermal insulation is applied inside the tank with expanded polystyrene boards with a thickness of 50 mm to 100 mm depending on the area where the equipment is mounted, protected by a layer of geotextile of 2.5 mm (250gr/sq m) as a barrier thermal.
  • Also, between the concrete foundation and the membrane a double layer of geotextile will be layed to protect the latter and to reduce thermal transfer.
  • The watertightness of the tank is due to an EPDM geomembrane that has the role of maintaining water and which are cut according to the shape and geometric dimensions of the ordered tank.
  • Accessories – fittings, in-line pipe mounting brackets and other elements included in the tank are made of stainless steel, the stairs are made of aluminum, stainless steel or galvanized steel (depending on preference).
 

Each tank is accompanied by:

  • Full list of materials with their specifications
  • Certificate of conformity from manufacturer – TankRom Construct
  • ICECON technical certificate
  • EPDM technical certificate and approval for geomembrane
  • The tank foundation project
  • Quality certificate from the manufacturer – TankRom Construct
 

Tanks include the following accessories:

  • Stainless steel L304 supply
  • Stainless steel L304 man
  • Stainless steel L304 superabundance
  • Stainless steel L304 drain
  • Stainless steel L304 connection for fire extinguishing
  • Galvanized steel bath house
  • Float valve
  • Plate, anti-vortex and stainless steel sorbent L304
  • 1 x 3kW immersion heater, optional
  • Stainless steel, galvanized sheet or aluminum access staircase
  • Thermal insulation
  • Acoustic and light warning panel
  • Butterfly valves for fire extinguishing and bottom drainage
 

Delivery terms and conditions

Delivery time: 2-3 weeks after receipt of the firm order with the model confirmation containing:

  • Beneficiary’s acceptance on the drawings provided by the manufacturer
  • Delivery date confirmation
  • Prepayment transfer
  • If the foundation project is desired, send of the geological study
 

Lifting and assembly

Access to the place where the equipment will be unloaded should be convenient for 20 tons trucks, ensuring conditions for unloading and putting the parts into shelter.
Tank assembly, sealing, and testing will be done by our installation team within maximum 10 days of taking over the site.
The water source required for watertightness tests, the 220 V and 400 V electrical power to be available less than 15 meters from the mounting location.
A period of more than 45 days from the installation of the tank to watertightness tests is not recommended.

 

Payment methods

  • 50% prepayment through bank transfer when order is placed
  • 40% at the moment of delivery of the tank, with cheque or bank guarantee letter due 30 days after delivery
  • 10% at the moment of delivery of the tank with cheque tab or bank guarantee letter due 45 days after delivery

The payment will be made in RON at the exchange rate displayed by the NBR, and the percentages proposed can be negotiated.

 

Warranty

  • Equipment (tank) – 5 years
  • Consumables (accessories) – 2 years
scannere coduri de bare